Kick off event 9 May 2019

On 9 May 2019 the most talented Danish and foreign consultants, contractors and architects participated at the preliminary meeting which was held in Aarhus International Sailing Center. Here the upcoming tender for the Aarhus ReWater project and the project itself was presented.

You can download the concept and process description for the realisation of Aarhus ReWater below in an english and a danish version:

Aarhus ReWater Prospectus (ENG)

Aarhus ReWater Prospekt (DA)

Presentations at the event:

Presentation_of_the_project_and_tender_procedure.pdf

The_Resource_Recovery_Facility_of_the_future_is_adaptable.pdf

Resources_recovery_from_wastewater_in_a_rapid_changing_world.pdf

Pictures from the event can be found here.

 

 

The world’s most resource efficient wastewater treatment plant

It is a fact: The world’s most efficient resource facility and knowledge platform for the treatment of wastewater will be located in Aarhus - close to the city, close to the sea and close to the citizens. Aarhus ReWater will receive the city’s wastewater and transform it into new materials, new products and new energy for the next 50 years. At least.

We are already experiencing this return on wastewater in the shape of heating, biogas, electricity and fertiliser. In the future, it will also be possible to produce proteins and perhaps even ingredients for the pharmaceutical industry from wastewater. In the long term, it is all about keeping an open mind.

Come join us in shaping the future!